Finally, we get some action and the crew comes out to build our barn. First the holes are dug, then the poles are set, and finally they are filled with concrete. The picture of the truck shows how materials were delivered to our site.
These pictures show the size of the holes, each 5 - 6 feet deep, how the poles are placed into the holes, and finally the size of the auger used to dig each hole.
The following photos show how each pole was placed into the holes.
These last pictures show the concrete being poured into each hole. It was an all day project, but much got done!